
TBM Launch Frame
Obayashi-Jay Dee JV | Cemetery Brook Drain Tunnel
- Custom TBM thrust frame and embedded sub-frame assembly designed, engineered, and fabricated for the Cemetery Brook Drain Tunnel.
- Designed to resist 1.8 million pounds of TBM thrust for a 13.5′ OD tunnel.
Interested in a Project?
Partner with Kelley Engineered Equipment to bring expert insight and innovative solutions to your next project. Our team is committed to delivering customized engineering support and unwavering dedication to your success.









